At the product design and prototyping stage, Advantech DTOS team delivers a 50-Day time-to-prototype sample to meet the customers' fast time-to-market requirements. |
|
|
|
Schematic Design |
According to confirmed project specifications, our electronic engineers carry out the hardware design. |
|
|
Knowledge Database |
With years of domain expertise in the field, Advantech has built up a knowledge database to facilitate an efficient and cost effective design process. |
|
|
Documentation |
Ensures each project and design stage is well traced, documented and managed.
|
|
|
PCB Layout |
After the schematic design is confirmed, the project will move to the next stage for PCB design. |
|
|
Sample Pilot Run |
At this sample trial production stage, the dedicated DTOS manufacturing team joins the project to carry out pilot run samples and preparation for mass production.
|
|
|
Sample Test |
Pilot run sample will have basic tests at this stage. |
|
|
|